|
SPC Fair at the 2007 Home Show

|
John Gonsalves speaking at the Groundbreaking

|
|
Lining up to break ground

|
Excavation Begins!

|
|
Tons of Loam

|
Footings are in

|
|
W.G. Tomko roughing in some plumbing

|
Cement being poured for the foundation

|
|
Foundation Peeled and looking sharp

|
Deck Installation begins

|
|
Getting some glue down

|
Paul finalizing a few details

|
|
First of the Walls going up

|
Many hands....

|
|
Simonton Windows Arrive!

|
James arrives as the sun comes out

|
|
PA Carpenters ripping some 2x

|
Night Shift finishing up

|
|
Greeted on Day two with some snow

|
Paul getting a Truss ready

|
|
First Truss getting set

|
Working the top of the truss

|
|
Three trusses at a time!

|
Paul and John at the end of Day 2 of the Build Brigade

|
|
Volunteers begin Interior work

|
Norm from Allied leading a crew

|
|
Airborne volunteer installing the Ply Gem siding

|
Zeke and Son Roofing doing an install

|
|
Awesome volunteers running the HQ

|
Joe and Paul getting ready to install a door

|
|
Basement Floor is poured

|
Electrical, Gas and Plumbing installed

|
|
Duct work looking great

|
Framework for the Brady Bunch oven

|
|
A look into the garage

|
Picture the kitchen here!

|
|
Basement Stairs installed

|
Whirlpool Tub roughed in

|
|
Furnace ready to be installed

|
Outside looking sharp

|
|
A view from the outside

|
The rear of the house

|
|
Blue board getting installed

|
Whirlpool tub installed

|
|
Sprinkler tank is installed and filled

|
Perfecting the Clever Built adaptations

|
|
Accessible shower is installed

|
Jacuzzi Tub looks sharp

|
|
Gravel making ready for concrete

|
Stunning kitchen profile

|
|
Another angle in the kitchen

|
A peek into the closet

|
|
Future home of the fireplace

|
Framing up the patio

|
|
Framing the driveway too!

|
A view of the finished driveway

|
|
Concrete Creations LLC awesome work

|
|